No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | CV. TUANANE ENGINEERING | 96.610.532.2-942.000 | Rp. 49.704.412,50 | Rp. 49.704.412,50 | Rp. 49.704.412,50 |
No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | CV. TUANANE ENGINEERING | 96.610.532.2-942.000 | Rp. 49.704.412,50 | Rp. 49.704.412,50 | Rp. 49.704.412,50 |